My last post showed that the block was laid and ready to go. So I had thought. The block work was not done. Team came in to ‘finish’ the work. They put in more rebar inside the top of the block. Then they brought in another cement truck and filled all of the block creating on large fill. They even filled the center pillars. Once the concrete was in they added strapping into the pour.
By the time they were done, it was getting late. Not sure how well this will show.
Cement Truck
Filling the Pumper
Concrete Team
Pumping Concrete into the block
Tying it all together
Smoothing the top of the block
Till Next Time (TNT)
Ron M.
Cane Bay Photography
http://canebayphoto.com
-30-